Gas station & c-store
Gas station construction in Georgia
A c-store is not a small retail building with pumps in front. It's a permitting problem, an environmental problem, and a coordination problem wearing a retail building as a disguise — and it's where general contractors without fuel experience lose schedule and money.
We've built these from raw dirt and from demolished legacy fuel sites, and we've operated them afterward.
What we handle
- Demolition of existing improvements and legacy fuel infrastructure
- Site work, erosion control, grading, and DOT access
- Building footings, slab, block wall, and structural steel
- Exterior façade, roofing, and storefront
- Canopy footings, erection, fascia, and lighting
- Dispenser installation and tank field coordination
- Cathodic protection testing and remediation
- Petroleum plan review coordination with the state
- Municipal permitting, utility taps, and inspections
- Interior buildout: coolers, shelving, counters, restrooms, MEP
The parts that go wrong
Petroleum plan review runs on its own timeline and does not care about your building permit. Legacy tank fields turn up surprises after the Phase I comes back clean.
Canopy steel has a long lead time and has to be ordered against a slab date months out. Tree ordinances, variance hearings, and access easements can add a quarter before dirt moves.
We sequence around these because we've paid for them ourselves.
Why it matters
Priced by people who've owned one.
Most contractors bidding a c-store have never operated one. Our principals have developed, built, and leased fuel and retail sites across Georgia since 2017.
So we price a canopy, a tank field, and a DOT curb cut from experience rather than from a square-foot rule of thumb — and we know which of them will move the opening date.
Recent fuel projects
Across Georgia.
Who this is for
Fuel jobbers, independent operators, and developers building branded or unbranded gas stations and convenience stores in Georgia.
Start a project
Tell us about the site.
Send the address, the building type, and where you are — raw land, plans in hand, or mid-permit. We'll tell you honestly whether we're the right fit and what a realistic schedule looks like.