Aerial view of a completed retail center and fuel facility built by Ark Construction in Georgia

Retail and commercial construction across Georgia.

Ark Construction builds retail centers and commercial buildings, and does the site work under them — from raw land to the day the doors open.

Why Ark

We build what we own.

Most contractors have never had to own what they build. Our principals have developed, built, and leased commercial property across Georgia since 2017 — which means we price site work, utilities, and access from experience rather than from a square-foot rule of thumb.

That ownership view carries into every project: utility coordination, tenant sequencing, and a schedule that has to hold, because we know what a late opening costs the person paying for it.

Aerial view of a graded site with the building slab poured and the fuel tank field inConvenience store shell in weather wrap with canopy columns standingClad convenience store with the fuel canopy up and the forecourt still unpavedFinished convenience store and fuel forecourt seen from above

How a build goes

Dirt to doors open.

[4–8 weeks]

Site work, tanks, and slab

Clearing, erosion control, and grading. Underground tanks set and backfilled, utilities stubbed up, building slab poured. The permit timeline usually decides this stage, not the dirt.

[6–10 weeks]

Structure and canopy steel

Structural steel, roof deck, sheathing, and weather barrier. Canopy columns stand on their footings; that steel was ordered against the slab date months ahead.

[8–12 weeks]

Envelope and canopy

Brick and panels, storefront glazing, roofing, and rooftop units. Canopy deck and fascia set, islands formed, MEP rough-in inside.

[4–6 weeks]

Paving, dispensers, and C/O

Forecourt paving, dispensers set and commissioned, interior buildout, landscaping and signage, inspections, and certificate of occupancy.

  1. Site work, tanks, and slab [4–8 weeks] Clearing, erosion control, and grading. Underground tanks set and backfilled, utilities stubbed up, building slab poured. The permit timeline usually decides this stage, not the dirt.
  2. Structure and canopy steel [6–10 weeks] Structural steel, roof deck, sheathing, and weather barrier. Canopy columns stand on their footings; that steel was ordered against the slab date months ahead.
  3. Envelope and canopy [8–12 weeks] Brick and panels, storefront glazing, roofing, and rooftop units. Canopy deck and fascia set, islands formed, MEP rough-in inside.
  4. Paving, dispensers, and C/O [4–6 weeks] Forecourt paving, dispensers set and commissioned, interior buildout, landscaping and signage, inspections, and certificate of occupancy.

Recent work

Built in Georgia.

Aerial view of a seven-unit retail center with a Chevron fuel canopy in Columbus, Georgia
Columbus, GA 7-unit retail center with Chevron gas station 2025
Aerial view of a multi-tenant retail building with wood-look and white brick façades in Norcross, Georgia
Norcross, GA Multi-tenant Shell gas station and Tesla Supercharger site 2025
BP convenience store and fuel canopy at dusk in Lula, Georgia
Lula, GA BP gas station and convenience store 2025
BP convenience store and fuel canopy seen from the street in Macon, Georgia
Macon, GA BP gas station and convenience store conversion 2024
Shell fuel canopy on brick columns in front of a retail plaza in Warner Robins, Georgia
Warner Robins, GA Shell gas station anchoring a retail plaza 2023